Rebuilding a Limestone Driveway and adding Parking Spots.

Rebuilding Limestone Driveway and adding Parking Spots

Rebuild a Limestone driveway and adding additional parking space.  This project in Allegany New York we used a John Deere 110 TLB Backhoe, Small Weber Tamp, Moritz 12 Foot Dump trailer and a GMC Duramax Diesel.  The customer wanted to keep the material to fill in holes in his lawn.  We brought in 5 Ton of Screened Bank run to bring up the left side of the driveway and 15 tons of Limestone to top of the driveway.  Including in hauling all material the project was finished in one day.  The final project took, 5 tons of bank run and 15 tons of Limestone.

This project took about 8 hours including hauling material to the job site.

TIMELINE:

00:00 = Introduction
02:48 = Cleaning the Top Soil from the Top of the Driveway
04:26 = Removing the Top Soil
05:58 = Leveling the Driveway Top
07:20 = Bring in the Screened Bank Run
07:38 = Leveling the Screened Bank Run
10:16 = Using a Weber Tamp to Tamp the Bank Run before the Limestone is spread
12:10 = First load of Crusher Run Limestone with Dust, better for packing
12:50 = Gate Spreading with the Moritz Dump Trailer the next 5 Tons of Limestone
13:37 = Spreading the Limestone Top
14:40 = The Final 5 Tons of Limestone, a total of 15 tons
15:00 = Leveling all the Limestone
20:40 = Tamping the Limestone to firm up the top
24:36 = Project is finished

Thanks for watching and please share with your friends

TOOLS FOR THE MAKING:

  1. From LandPro Equipment: John Deere 110 TLB Backhoe
  2. Moritz Dump Trailer
  3. Weber Tamp
  4. Duramax Diesel GMC Truck