Part 3 of 3 – Adding Extension to Driveway and cleaning up the yard

400 Ft Drive with John Deere 110 TLB

Rebuilding a 400 ft Driveway from Top Soil and Clay

This project goes over the final touches in building a 400 ft. driveway and using the Erskine Rockhound to clean everything up. The project total days in around 7 days to complete the job and ensure a solid driveway and cleaned French drain.

We used a John Deere 110 TLB, tested a John Deere 35G Mini Excavator, and John Deere skid steer 323E 

This project took about 3 days for a total of 7 at this point.

TIMELINE:

00:00 = Beginning
01:52 = Introduction
06:48 = Adding to the French Drain
09:36 = Adding a Turn Around Spot to the driveway
16:19 = Final touches to driveway
19:00 = Starting to Rain
27:00 = Day 7 starts with bringing in the Rock Hound
31:00 = How does the Rock Hound Work?
48:00 = End of Day 7

Thanks for watching and sharing with your friends

TOOLS FOR THE MAKING:

From LandPro: John Deere 110 TLB Backhoe
From LandPro: John Deere 323E Skid steer
From LandPro: John Deere 35G Mini Excavator
Moritz Trailer
Adobe Photoshop
Adobe Premiere Pro

MUSIC CREDIT GOES TO:

(http://www.freemusicarchive.org)

Share with Others

Facebook
Twitter
LinkedIn
Pinterest
Email