Rebuilding a 400 ft Driveway from Top Soil and Clay
How Too 3 Part Series
- Part 1 - Using Google Maps to help rebuilding the driveway
- Part 2 - Rebuilding the 400 Ft Driveway
- Part 3 - Finishing the 400 Ft Driveway
This project goes over the final touches in building a 400 ft. driveway and using the Erskine Rockhound to clean everything up. The project total days in around 7 days to complete the job and ensure a solid driveway and cleaned French drain.
We used a John Deere 110 TLB, tested a John Deere 35G Mini Excavator, and John Deere skid steer 323E
This project took about 3 days for a total of 7 at this point.
TIMELINE:
00:00 = Beginning
01:52 = Introduction
06:48 = Adding to the French Drain
09:36 = Adding a Turn Around Spot to the driveway
16:19 = Final touches to driveway
19:00 = Starting to Rain
27:00 = Day 7 starts with bringing in the Rock Hound
31:00 = How does the Rock Hound Work?
48:00 = End of Day 7
Thanks for watching and sharing with your friends
TOOLS FOR THE MAKING:
From LandPro: John Deere 110 TLB Backhoe
From LandPro: John Deere 323E Skid steer
From LandPro: John Deere 35G Mini Excavator
Moritz Trailer
Adobe Photoshop
Adobe Premiere Pro
MUSIC CREDIT GOES TO: